Managing multiple sign-offs in bulk
Use bulk sign-off to update multiple control activities from My Activities in a single action. Bulk sign-off helps you complete high-volume sign-offs faster while keeping review workflows consistent.
When cards are eligible for bulk sign-off
Cards are eligible only when they share the same activity type, project, and sign-off level:
- Same activity type (for example, all walkthroughs or all tests).
- Same project.
- Same sign-off level.
Note
-
Bulk sign-off applies only to cards that have the same activity type, project, and sign-off level.
-
You can update up to 20 cards per batch. If more cards match your filters, continue in additional batches until all eligible cards are signed off.
-
From the Platform home page (www.diligentoneplatform.com), select the Task Manager.
If you are already in Diligent One, you can use the left-hand navigation menu to switch to the Task Manager app.
- Select a control related activity in the Activities page.
- Select the down arrow on the Sign off button to open the dropdown. If the eligible item count is displayed next to Bulk sign off, select Bulk sign off.
- In the next panel, select the activities you want to sign off by selecting the respective check boxes. Select up to 20 cards, and then select Sign off.
- Observe the result of each sign-off displayed on each card, and retry if needed.
- Select Done or Cancel to return to the Activities page.
If some selected cards cannot be updated, resolve the issue on those cards and run bulk sign-off again for the remaining cards. Repeat these steps as per your requirement.